Switchboard Requirements

Terms and Conditions
ABN: 42 632 273 879  |  9/49 Biscayne Way, Jandakot WA 6164  |  (08) 9226 7900 | EC12050

  1. Pre-Work Requirements

    1.1 Asbestos Switchboards

    • Any switchboards containing asbestos materials must be upgraded and replaced before any electrical works can commence
    • Asbestos identification and removal will be conducted prior to works, with safe disposal
    • Works will not proceed until asbestos-free certification is provided

    1.2 Switchboard Defects

    • All existing switchboard defects must be rectified before new works can commence
    • Defects include but are not limited to: damaged enclosures, non-compliant wiring, missing labels, inadequate earthing, or safety hazards
    • A comprehensive switchboard inspection will be conducted prior to commencement
  2. Compliance and Safety

    2.1 Regulatory Compliance

    • All works must comply with AS/NZS 3000 Wiring Rules and WA Electrical Requirements
    • Works require appropriate electrical permits and inspections as mandated
    • Switchboard modifications must meet current Australian Standards

    2.2 Safety Requirements

    • Main power isolation required during works (temporary power loss expected)
    • Safety barriers and warning signage will be installed during works
    • All personnel must wear appropriate PPE and follow safety protocols
  3. Scope Limitations

    3.1 Existing Infrastructure

    • Works are limited to the agreed scope; additional defects discovered may require separate quotation
    • Meter box modifications or upgrades may require separate Western Power approval
    • Existing cable conditions may affect work feasibility and will be assessed on-site

    3.2 Access Requirements

    • Clear and safe access to switchboard location must be maintained
    • Customer responsible for removing stored items or obstacles
    • Works may be delayed if adequate access is not provided
  4. Testing and Certification

    4.1 Mandatory Testing

    • All circuits will be tested for insulation resistance, earth continuity, and RCD functionality
    • Test results must meet Australian Standards before works are deemed complete
    • Electrical Safety Certificate will be issued upon successful completion

    4.2 Non-Compliance Issues

    • Any circuits failing testing requirements must be rectified before completion
    • Additional costs for remedial works will be quoted separately
    • Works cannot be certified until all circuits meet safety standards
  5. Customer Responsibilities

    5.1 Preparation

    • Ensure all electrical appliances are switched off before works commence
    • Provide safe working environment free from hazards
    • Arrange alternative power sources if required for essential equipment

    5.2 Post-Work Requirements

    • Customer must not interfere with or modify completed works
    • Any subsequent electrical works must be performed by licensed electricians
    • Maintain clear access to switchboard for future maintenance
  6. Warranty and Liability

    6.1 Workmanship Guarantee

    • Sarros Lifetime Workmanship Guarantee applies to all installation works
    • Guarantee covers workmanship defects only (not equipment failures)
    • Original purchaser at original address only; non-transferable

    6.2 Limitation of Liability

    • Sarros not liable for pre-existing electrical faults or defects
    • Customer responsible for any damage to personal property during power isolation
    • Force majeure events may affect completion timeframes
  7. Variation Management

    • Any changes to original scope require written approval
    • Additional costs will be quoted before proceeding with variations
    • Customer may refuse variations, but original scope must still meet safety standards
  8. Completion and Handover

    8.1 Work Completion

    • Circuit directory labels will be updated to reflect new configuration
    • Customer briefing on new switchboard operation and safety features
    • All relevant documentation and certificates provided

    8.2 Final Inspection

    • Customer sign-off required before works deemed complete
    • Any concerns must be raised before final payment
    • Photo documentation retained for quality assurance
  9. Acknowledgment

    By proceeding with switchboard works, the customer acknowledges understanding and acceptance of these terms and conditions.